The trucks came and went, there is a pile of sand in your yard, and the driver left you a slip of paper for every load. Now the invoice has shown up and you want to know whether the two match. A delivery ticket is a simple document once you know what each line is for, and reading them right is how you keep the dirt side of a project honest, ours included.

What is on the ticket

Whether it comes out of our pit in Navarre or somebody else's, a ticket tells the same basic story. Who the material is for and where it went. What the material is. How much of it was on the truck. Which truck brought it and who drove it. When it left the pit and when it was dumped. And a signature, or a note that nobody was there to sign.

Every one of those lines answers a question you might have later. Keep the tickets together, in order, and keep them with the invoice. When something on a job does not add up, the tickets are where the answer usually is.

Material

The material line tells you what was in the bed, and fill is not one thing. Fill sand is the sugar sand this coast is made of, the fill dirt we dig at 3125 River Rd and the right material for a house pad near Navarre, Gulf Breeze, or Destin, because it drains and tightens up under a roller. Clay fill is heavier, holds water, and shows up more on jobs inland toward Milton and Crestview. Topsoil is the dark organic material for the yard, and it has no business under a slab.

If you ordered fill sand and the ticket says something else, that is the moment to ask, not after it has been spread. And if the pile does not look like what the ticket says, walk out and look before the next truck backs in.

Yards or tons

Quantity comes in one of two units, depending on where the dirt came from. A quarry with a scale sells by the ton. The truck crosses the scale empty and loaded and the difference is the weight of the load. A dirt pit usually sells by the yard or by the load, and the number on the ticket is the volume the bed carries.

Neither is wrong, but they do not convert cleanly, because a yard of dry sand and a yard of wet sand do not weigh the same, and a ton of clay takes up less room than a ton of sand. If you are comparing a scale ticket to a pit ticket, you are comparing weight to volume, and the difference you see is usually moisture, not somebody shorting you.

A load is the simplest unit of all. A tri axle dump truck carries what it carries, and a ticket that reads one load means one full bed. We sell by the load out of our pit for exactly that reason. It is the easiest number to check, because you can stand in your yard and count trucks.

Loose yards are not compacted yards

This is the one that causes the most arguments. The yards on a ticket are loose yards. That is the sand as it sits in the bed, fluffed up from being dug and dumped. Once that sand is spread in lifts and rolled tight, it takes up less room, because the air has been pushed out of it.

So a pad that needs a certain number of compacted yards will always take more loose yards than that to build, and a stack of tickets that adds up to more than the pad measures does not mean you were overcharged. It means the roller did its job. The shrink is bigger in clay and dirty fill than in clean sand, and bigger still if the dirt was wet when it was hauled.

When you get a fill estimate from us, the load count already carries that allowance. When you get one from someone else, ask whether the number is loose or compacted before you compare it to anything. It is the single most common reason two bids on the same pad look far apart.

Where it was dumped and who signed

Where the load was dumped matters more than people think. A truck that dumps at the road because the driveway was too soft, or because nobody was there to say where the pile goes, leaves you with the same yards in the wrong place and a skid steer bill to move them. Tell the pit where you want it before the first truck rolls, and be there for the first load if you can.

The signature is your side of the record. It says somebody saw the load land and agreed with what the ticket said about it. If you are not going to be there, tell the pit up front so the driver knows to note it and leave the ticket where you will find it. Unsigned tickets are not a problem on their own, but they are the ones that turn into arguments later.

Matching tickets to the invoice

When the invoice arrives, lay the tickets out and count. The number of loads on the invoice should match the number of tickets in your hand, the material should match what you ordered, and the dates should line up with the days trucks were in your yard. If any of that does not agree, call before you pay, with the ticket numbers in front of you.

If you are buying from us, you can order online at order.noblsitework.com, and the ticket comes with the truck either way.

NOBL Sitework is a licensed general contractor (CGC1537340) hauling fill and building pads across Santa Rosa, Okaloosa, Walton, Escambia, and Bay counties. If you are trying to figure out how much dirt a lot needs, call us at 850-238-3307 and we will walk it with you and work the number out on the ground.